Compliance & Approvals
Every EV charger installation follows the Abu Dhabi approval path: registration with TAQA Distribution and a dedicated EV meter, the DoE Electricity Wiring Regulations 2020 with an inspection before energisation, and a charger that meets the QCC requirements. We submit drawings, calculations and final inspection paperwork as part of the scope.
Electrical work. Mains-side electrical work and the utility (ADDC in Abu Dhabi, AADC in Al Ain) approval are carried out by a licensed electrical contractor named in the written quote. Quicknet coordinates the project and handles the ELV, IT and security side.