50 kW DC Fast
Entry-level DC fast. 20%–80% in 35–50 minutes for most EVs. Ideal for small forecourts and rural sites.
- CCS2 + optional CHAdeMO
- Air-cooled cable
- ~50–75 kWh / hour delivered
- Single-cabinet footprint
- From AED 90,000 installed
High-power DC fast EV charging hubs across the UAE — 50, 120, 180 and 240 kW units with CCS Combo 2 and optional CHAdeMO connectors. Transformer-grade civil works, OCPP back-office and full payment integration. 20–40 minute 20% to 80% charging window.
When dwell-time is minutes, not hours, DC fast charging is the only option. Here is what 50 to 240 kW installation really involves in the UAE.
DC fast chargers bypass the EV onboard converter and deliver direct current straight to the battery at 50 to 240 kW. Most modern EVs accept 100–200 kW peak DC, charging from 20% to 80% in 20–40 minutes. That makes DC fast the right answer for ADNOC and ENOC forecourts, highway service plazas on the E11 / E22 / E311, mall and hypermarket parking, hotel porte-cocheres and fleet depots in Mussafah and ICAD.
DC fast installation is fundamentally different from AC. The power draw of a single 180 kW unit exceeds an entire small villa. Cable cross-section is doubled or tripled, transformer coordination is normally required, and utility approval needs a full single-line diagram with protection coordination. Liquid-cooled cables become mandatory at 180 kW+ to keep CCS cables thin enough to handle.
Electrical work. Mains-side electrical work and the utility (ADDC in Abu Dhabi, AADC in Al Ain) approval are carried out by a licensed electrical contractor named in the written quote. Quicknet coordinates the project and handles the ELV, IT and security side.
Quicknet coordinates DC fast charging hubs end-to-end — the load study, transformer specification and civil foundations are handled with the licensed electrical contractor named in the written quote; Quicknet supplies IP66 enclosures with active cooling, OCPP back-office, RFID / app / contactless payment integration, and ADNOC / mall / hotel branding kits. CCS Combo 2 is standard across every modern EU and Korean EV; CHAdeMO is added where Japanese fleet vehicles dominate.
Each tier suits a different traffic profile, from low-volume rural petrol stations to high-throughput highway service plazas.
Entry-level DC fast. 20%–80% in 35–50 minutes for most EVs. Ideal for small forecourts and rural sites.
Mid-power DC fast. 20%–80% in 20–30 minutes. Mall, hotel and busy urban forecourts.
Top tier DC fast. 20%–80% in 15–20 minutes on modern EVs. Highway service plazas and fleet depots.
20% to 80% in under 40 minutes for most EVs. Matches a coffee, a meal or a shop visit — not an overnight stay.
5–10x more sessions per day vs AC. Per-kWh pricing turns each bay into a revenue-generating asset.
Last-mile delivery, ride-hailing and corporate pool cars need fast turnaround. DC fast keeps fleet utilisation high.
For hotels, malls and forecourts, DC fast is a customer-facing amenity — visible, branded, premium.
UAE highway plazas need DC fast to support inter-emirate EV travel. Single Tesla / BMW / Mercedes road trip = your forecourt.
New EV models accept 200–350 kW peak. 240 kW dual-gun stations are ready for the next two generations of EV.
Single-line diagrams, protection coordination notes and transformer specification prepared by the licensed electrical contractor named in the written quote for the consultant or utility submission.
ABB Terra 184, Schneider EVlink Pro, Delta Ultra Fast, Hypercharger HYC — right brand per site, not per kickback.
OCPP 1.6 / 2.0.1 with white-label payment UI — you keep platform choice. Apple / Google Pay, fleet cards, RFID.
Built ride-hailing and last-mile depots in Mussafah and ICAD — including charger-vehicle authentication workflows.
DC charging is Mode 4: the DoE Electricity Wiring Regulations 2020 require a locking system so a connector cannot be pulled out while energised (clause 13.3.8), enough space around the unit for ventilation and cooling (13.1.15), and no installation inside hazardous zones such as petrol-station explosive atmospheres (13.1.11). Where AC and DC share one connector it must be a Combo 2 type (13.3.10).
High-power sites need the same dedicated EV meter, QCC-compliant equipment and design approval as a home charger. The DoE issued an interim consent in June 2021 for IP54-rated outdoor high-power equipment; ordinary AC chargers still need IP55 outdoors. The DoE's Barq network is rolling out more than 50 ultra-fast 360 kW chargers across Abu Dhabi, Al Ain and Al Dhafra. See the EV charger approval and registration guide.
Power is delivered direct to the battery. 50 kW gives ~50–75 kWh per hour — full charge in 60–90 minutes. 120 kW ~150 kWh per hour — 30–45 minutes. 240 kW dual-gun can charge two cars at 120 kW each, or one at full speed — 15–25 minutes 20% to 80% on modern 800 V architecture EVs.
Usually yes for 120 kW+. A single 180 kW unit draws more power than most small commercial properties — the local distribution utility will require a dedicated transformer (typically 250 or 500 kVA depending on bay count). A load study by the licensed electrical contractor named in the written quote sizes this.
CCS Combo 2 is standard across every EU, US and Korean EV sold in the UAE (Tesla, BMW, Mercedes, Audi, Hyundai, Kia). CHAdeMO is a Japanese legacy standard — older Nissan Leaf and some commercial Japanese vehicles use it. Add CHAdeMO only if you have a confirmed fleet of CHAdeMO vehicles.
Hardware: 50 kW AED 90,000–130,000. 120 kW AED 180,000–260,000. 240 kW dual-gun AED 280,000–380,000. Add transformer, civil and authority fees — typical full-site cost AED 350,000–700,000 for a 2-bay 180 kW hub.
Typically 4–10 weeks: transformer order lead time 4–8 weeks, civil foundations 1–2 weeks, electrical works 1 week, commissioning 1 week. Distribution-utility approval runs in parallel.
Modern EV battery management systems carefully limit current at high state-of-charge to protect the pack. Occasional DC fast charging (multiple times per week) has no measurable long-term impact on battery health for current-generation EVs (Tesla 4680, BYD Blade, LG NCM chemistries).
Yes — OCPP-compliant payment, per-kWh or per-minute billing, fleet-card authentication, branded customer UI. Payback depends on how often the chargers are used, the tariff you set and your electricity cost, so we model it for your site instead of quoting a typical figure.
DC charging is Mode 4: the connector must lock while energised, the unit needs space for ventilation, it must not sit in a hazardous zone, and it needs the distribution company's design approval, a dedicated EV meter and QCC-compliant equipment. See the EV charger approval and registration guide.
Rarely. DC fast chargers need a commercial-scale supply, often a dedicated feeder or transformer, plus civil works and the distribution company's approval, so they suit commercial sites and depots. Most homes use a Type 2 AC wall charger.
Real reviews from the Google Business Profiles of Quicknet Computers across our three branches. Independent integrator since 2012, ADMCC approved, ISO 9001 and ISO 27001 certified.
Tell us about your site. A free survey and a written quote follow every enquiry.
Quicknet Assistant
Common questions
Hi! 👋 I'm the Quicknet Assistant.
I can answer common questions about our services. What can I help you with today?