Home AMC (Residential)
For installed home wall-boxes. Quarterly inspection, firmware, RCD test, connector cleaning, 4-hour emergency.
- 4 inspections per year
- Firmware update visits
- RCD / MCB testing
- 4-hour emergency response
- From AED 400 / year
Annual Maintenance Contracts for installed EV chargers in Abu Dhabi and Al Ain (other emirates on request) — quarterly inspection, firmware updates, RCD / MCB testing, connector cleaning, 4-hour emergency fault response. Works for any brand: Tesla, Wallbox, ABB, Schneider, Delta, EVlink.
Electrical work. Mains-side electrical work and the utility (ADDC in Abu Dhabi, AADC in Al Ain) approval are carried out by a licensed electrical contractor named in the written quote. Quicknet coordinates the project and handles the ELV, IT and security side.
EV chargers are solid-state but they live outdoors in 50°C heat, dust and humidity. Quarterly inspection helps prevent the faults that catch UAE owners off guard.
EV chargers in the UAE see operating conditions far harsher than the European factory spec. Outdoor wall-boxes endure 50 °C summer heat, fine sand penetration through any cable-management gap, humidity, and daily start-stop charging cycles. Without quarterly inspection, the first sign of trouble is usually a failed charge at 11 PM — or worse, a tripped RCD that leaves the EV uncharged for a morning commute.
Quicknet AMC plans cover the full failure surface: RCD / MCB electrical-protection tests, connector pin inspection and cleaning, IP66 enclosure inspection, dust filter cleaning, firmware updates, OCPP back-office health checks for commercial sites, surge protector inspection, and load-cycle log analysis for early-warning fault detection. All performed by certified Quicknet engineers from the Mussafah Shabia branch.
Plans are brand-agnostic — we maintain Wallbox, ABB, Schneider, Delta, EVlink, Hypercharger and Tesla Wall Connector. Same AMC, same 4-hour emergency response. AMC pricing depends on the charger type and the number of units; ask for an itemised quote.
Right-sized for home, commercial AC and DC fast charging deployments.
For installed home wall-boxes. Quarterly inspection, firmware, RCD test, connector cleaning, 4-hour emergency.
For multi-bay AC stations at offices, hotels, malls. Adds OCPP back-office health checks and uptime reporting.
For 50–240 kW DC fast hubs. Adds cooling-system inspection, transformer-side checks and revenue audit.
Predictable preventive maintenance plus genuine 4-hour emergency response, not just an invoice every year.
We audit your installed charger (any brand), log serial numbers, photograph install, and set up the AMC schedule.
Certified engineer inspects connectors, RCD / MCB, enclosure, firmware, cable integrity. Written report after each visit.
Manufacturer firmware updates pushed and verified.
4-hour engineer dispatch from Mussafah for AMC clients. AMC emergency hotline.
Written report of every visit — documentation for property managers, insurance and ESG reporting.
Quarterly preventive inspection looks for developing faults before they cause a failed charge session.
AMC clients get genuine 4-hour engineer dispatch — not "next available Tuesday".
Written quarterly reports support insurance claims, property valuations and ESG reporting.
Check your warranty terms; many require documented servicing.
Predictable maintenance cost beats expensive emergency call-outs and full hardware replacements.
Wallbox, ABB, Schneider, Delta, Tesla, Hypercharger — all covered under the same AMC structure.
Maintain any installed charger — you don't have to have used Quicknet for the original install.
Quarterly written report after every preventive visit. Useful for property managers, insurance and ESG.
AMC emergency hotline plus 4-hour engineer dispatch from Mussafah. No outsourcing, no "next available".
The DoE Electricity Wiring Regulations 2020 require periodic inspection and testing of EV charging equipment in line with the regulations and the manufacturer's recommendations (clause 13.7.2). Owners and operators must give the DoE the information it requests about their chargers (13.8.1), and operators of publicly accessible chargers must provide their service-charge rates and payment mechanism on request (13.8.2).
A maintenance contract is the practical way to schedule and document those inspections and keep RCD tests, firmware and labelling current. The rules around registration and the EV meter are in our EV charger approval and registration guide.
Yes. UAE outdoor conditions (50 °C heat, fine dust, humidity) are far harsher than the European factory spec for most chargers. Quarterly preventive inspection catches RCD drift, connector pin wear, enclosure water ingress and firmware bugs before they cause a failed charge or a tripped breaker.
Yes — AMC is brand-agnostic and install-agnostic. We onboard any installed charger (Wallbox, Tesla, ABB, Schneider, Delta, EVlink, Hypercharger), audit the install, and put it on the AMC schedule. Common in cases where the original installer is no longer in business or unresponsive.
Residential home charger: AED 400–900 per year. Commercial AC bay: AED 1,500–2,500 per bay per year. DC fast charger: custom-priced per unit. Home plans include 4 preventive visits and commercial AC and DC plans monthly preventive checks; all tiers include 4-hour emergency response.
For AMC clients, certified engineer dispatch from Mussafah within 4 hours of a verified fault, AMC emergency hotline coverage, and spare parts sourced for each fault.
Standard AMC covers labour, preventive parts (filters, gaskets) and minor consumables. Hardware replacement (full chargers, control boards) is invoiced separately at AMC-discounted rates. Many DC fast AMC plans include hardware coverage at higher tier pricing.
Manufacturer firmware updates are deployed at the next quarterly visit unless a critical security or compliance update requires faster action — in which case we push it remotely (OCPP back-office) or schedule a special visit within 1 week.
Yes. The DoE Electricity Wiring Regulations 2020 require periodic inspection and testing of EV charging equipment in line with the regulations and the manufacturer's recommendations. A maintenance contract schedules and records them.
AMC pricing depends on the number and type of chargers, the site and the scope: inspection frequency, firmware updates and response time. We quote in writing; there is no standard rate.
Send us the charger make and the fault light or error it shows. We diagnose it and repair or replace faulty parts, under an AMC or as a one-off call-out.
Yes, on a project basis from our Abu Dhabi team. We first survey the installed chargers, then agree the visit scope in a written quote. For new installs in Dubai see EV charger installation in Dubai.
Tell us about your site. A free survey and a written quote follow every enquiry.
Quicknet Assistant
Common questions
Hi! 👋 I'm the Quicknet Assistant.
I can answer common questions about our services. What can I help you with today?