Who decides: owner, tenant or building management
- OWNER
Owners
Usually need approval from the owners' association or building management before work on shared supply or common areas.
- TENANT
Tenants
Need the landlord's consent as well as management's. We can prepare the technical documents for the landlord.
- MANAGER
Building managers
Can ask us for a building survey and a shared, load-managed design for several residents.
What we check at the survey
- 01
Parking layout
Which bays residents use and where chargers can be mounted safely.
- 02
Supply and board capacity
Available capacity in the riser or distribution board, and the cable route.
- 03
Building rules
Fire, access and common-area rules that affect cable routes and mounting.
- 04
Metering and billing
How each resident's consumption is measured and paid for.
Single bay or shared multi-bay
- 1
One bay
A single wall-box on its own circuit for one resident.
- 2+
Shared bays
Several chargers sharing one supply with load management, so the building supply is not overloaded.
Metering and utility registration
In Abu Dhabi an EV charger normally needs its own meter and registration with the distribution company; Dubai and other emirates have their own rules. We confirm the current requirements for your building before work starts, and we do not quote a utility rule as final until it is checked.
Documents management usually asks for
- A request letter from the owner or tenant
- A single-line diagram and load note for the proposed charger
- The charger data sheet and installation method
- Proof of the installer's credentials. We can supply our certificates.
Tell us about your building
A free survey and a written quote follow every enquiry.
- Building name and area
- Whether you are an owner, tenant or building manager
- Number of bays
- Car model
- When you need it done
Send the details on WhatsAppRequest a quoteCall +971 50 852 9609
Apartment EV Charging FAQs
Can a tenant install an EV charger?
Usually only with the landlord's consent and the building management's permission. We can prepare the technical documents they ask for.
Do I need a NOC from the building?
Most buildings ask for written permission from management or the owners' association. Requirements vary by building, so check yours; we prepare the technical documents.
Who pays for the electricity?
It depends on the building's policy: your own meter, or per-user billing through a smart charger. We design to the policy your building uses.
Can several residents share one supply?
Yes. Load management lets several chargers share a supply without overloading it.
Do you handle utility registration?
Where the distribution company requires registration or a dedicated meter, we coordinate it. We confirm the current rules for your building first.
Do you cover Dubai buildings?
Yes, on a project basis from our Abu Dhabi team. See our Dubai EV charger installation page.
